Model HR-150A/HRS-150
In one sentence: for the your team project we recommend the HR-150A/HRS-150, delivered as main unit + standard accessories + first training, 15–30 working days for standard configuration.
Dwell Time0-60S
ModelHR-150A/HRS-150
CategoryRockwell Hardness Testers
Standard lead time15–30 working days
The short version · Three things to know before the datasheet
What it doesFor measurement and inspection of Rockwell Hardness Testers, producing traceable records instead of visual checks and manual calculation.
Who it fitsIncoming inspection, lab sampling, process validation and final inspection — the larger the batch and the tighter the tolerance, the bigger the gain.
Not the right fit ifIf you only need a one-off rough check, or your parts exceed this model’s range — in both cases we will propose a cheaper route.
| Customer | — |
Contact | — |
| Tel | — |
Project | — |
| Qty | 1 |
Requirements | Configured around your samples and test items, meeting repeatability and data-traceability requirements for batch inspection. |
In this proposal
P2 Requirement & system layout
P3 Specifications, explained
P4 Scope of supply & workflow
P5 Delivery, service & commercial
· Standards and signature page
About us
上海中研仪器制造有限公司成立于 2008 年 7 月,注册资本 388 万元,专注金相制样、硬度检测、力学试验与光学测量仪器的研发制造,在售型号 70 余款。国家级高新技术企业(GR202531006980)、上海市专精特新中小企业,两项发明专利已获授权。
整机保修一年,上海奉贤制造基地提供样机测试、夹具定制与上门安装培训。
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTD · 021-51693591 · zhongyanyiqi@163.comYR-P261117-0001
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTDTECHNICAL PROPOSAL
HR-150A/HRS-150
2026-11-17
1. Your requirement
The goal is accurate, fast and traceable measurement. This proposal is built around those three: the machine secures accuracy, the accessories secure fixturing and throughput, the software secures traceability.
Taking the HR-150A/HRS-150 as an example, key figures on the cover and in section 4; if sample size or batch differs from the description, fixtures and range are adjusted at the technical-protocol stage without changing the base model.
2. How the system is built
Measuring capabilityWhat it can measure — the first thing to check against your samples
Structure & travelStage, travel, dimensions and weight — siting and fixturing
Loading & controlLoading mode, speed, dwell and software interfaces
Power & environmentPower, consumption and ambient requirements
Accessories & configurationStandard, optional and supplied-with items
Modules listed reflect this model’s actual configuration; an omitted group means it does not apply, not that it was left out.
3. Why this model
- Key figures map directly onto acceptance criteria — no conversion, no derating.
- Each model comes in a premium and a standard build, so budget and accuracy can be discussed separately.
- Factory installation, commissioning and training — producing reports from day one; automation or data interfaces can be added later without replacing the machine.
- A premium build of the same model is available: tighter assembly tolerances, upgraded components and higher-grade factory calibration, suited to metrology institutes and research acceptance.
Before you sign: what the price includes — and what it does not
This section is written before signing so that nothing turns up missing on delivery day. It follows the standard configuration; special requirements can be listed separately in the technical agreement.
Included
- Main unit plus factory standard accessories (see Section 5)
- Factory inspection report, certificate, packing list, operation and maintenance manual
- First installation, commissioning and operation training (remote or on site, travel included)
- One-year warranty on the whole unit; free upgrades within the same software version for life
- Domestic transport and transit insurance (up to unloading at your plant)
Not included (quoted separately)
- Special fixtures, custom tooling and modifications beyond the standard range
- Third-party metrology verification or calibration (if a CNAS certificate is required)
- On-site power modification, foundation, compressed air, temperature and humidity control
- Consumables (indenters, cutting wheels, polishing cloths, reference blocks)
- Out-of-warranty on-site service and spare parts
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTD · 021-51693591 · zhongyanyiqi@163.comYR-P261117-0001
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTDTECHNICAL PROPOSAL
HR-150A/HRS-150
2026-11-17
4. Specifications
| Model | HR-150A · HRS-150 |
|---|
| Test Force | 588(60kg) 、980N(100kg)、1471N(150kg) |
|---|
| Test force loading method | Manual · automatic |
|---|
| 硬度测试范围 | HRA:20 ~88、HRB:20~100、HRC:20~70 |
|---|
| Dwell Time | 0-60S |
|---|
| Reading Mode | 表盘(金属) · 触摸屏数显 |
|---|
| Max Specimen Height | 170mm |
|---|
| 压头中心距离 | 165mm |
|---|
| Overall Dimensions | 550 ×240×750mm |
|---|
| Main unit weight | 100kg |
|---|
| Power Supply | 220V/50HZ |
|---|
| Main Unit | 一台 |
|---|
| 砝码 | 三只 |
|---|
| 太 stage | 一件 |
|---|
| 中 stage | 一件 |
|---|
| V-type stage | 一件 |
|---|
| 金刚石洛氏压头 | 一只 |
|---|
| 洛氏球压头 | 一只 |
|---|
| 洛氏硬度块 | 三块 |
|---|
| 打印纸 | 一包 |
|---|
| Power supply 线 | 一根 |
|---|
Three things to check before you compare
- The scale matters more than the number. If the drawing says HRC, measure HRC; if HV, measure Vickers. Converted values are for reference only.
- Range is not accuracy. Range tells you what fits; error and repeatability tell you how accurate it is — read both columns together.
- Acceptance is proven on your samples, not on the brochure. Provide 3–5 real workpieces for an on-site repeatability test; sign once the numbers match.
If you need a benchmark against your current or an imported instrument, we can run the same samples and issue the data.
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTD · 021-51693591 · zhongyanyiqi@163.comYR-P261117-0001
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTDTECHNICAL PROPOSAL
HR-150A/HRS-150
2026-11-17
5. Scope of supply
- Main unit weight 100kg
- Main Unit 一台
- 打印纸 一包
Consumables and spares are quoted separately by annual usage; for the first order we recommend one set of wear parts to avoid downtime.
6. Inspection workflow
01Sample prep: prepare specimens to the standard, record IDs and ambient conditions
02Fixturing and setup: select the program, confirm load, range and scale
03Measure and verify: consecutive measurements with out-of-tolerance alerts and re-test when needed
04Reporting: export data with calibration status and measurement uncertainty
7. Applicable standards
- Per the acceptance criteria agreed in the technical protocol
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTD · 021-51693591 · zhongyanyiqi@163.comYR-P261117-0001
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTDTECHNICAL PROPOSAL
HR-150A/HRS-150
2026-11-17
8. Delivery and implementation
| Stage | Scope | Duration |
| Technical review | Confirm samples, range, fixtures and acceptance criteria; sign the technical protocol | 3–5 days |
| Production and calibration | Assembly, burn-in, factory calibration with data report | 15–30 days |
| Delivery and installation | Crated shipment; unpacking, positioning and commissioning on site | 3–7 days |
| Training and acceptance | Operation and maintenance training; acceptance test with standard samples | 1–2 days |
9. Acceptance and training
- Acceptance basis: the signed technical protocol plus the standards in section 7
- Acceptance samples: please provide 3–5 real workpieces for an on-site repeatability test
- Training goal: the inspector can fixture, measure and issue a report independently
- Documents: manual, conformity certificate, calibration certificate, packing list
10. Service
- One-year machine warranty; replacement for quality issues
- First on-site installation and travel free of charge
- Technical hotline on working days; on-site visit by appointment
- Free lifetime upgrades within the same software version
- Optional automated loading, data interfaces and LIMS/MES integration
- Common spares and consumables kept in stock to shorten downtime
11. Commercial terms
| Price | Quoted on configuration (tax and domestic freight included) |
| Payment | 30% deposit, 70% before shipment |
| Lead time | 15–30 working days for standard configuration |
Customer (signature & stamp)
Date:
Supplier (signature & stamp)
Date:
This proposal is a technical recommendation. Final scope, acceptance criteria and price are subject to the signed technical agreement.
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTD · 021-51693591 · zhongyanyiqi@163.comYR-P261117-0001