Fill in customer info Back to product
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTDSHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTD

TECHNICAL PROPOSAL

产品技术方案书
No.:YR-P261118-0045 Date:2026-11-18 Valid 30 days
Manual Mounting Presses

Metallographic Mounting Press (Manual)

Model Metallographic Mounting Press (Manual)
Metallographic Mounting Press (Manual)
In one sentence: for the your team project we recommend the Metallographic Mounting Press (Manual), delivered as main unit + standard accessories + first training, 15–30 working days for standard configuration.
加温时间0-99 分(可调)
CategoryManual Mounting Presses
Standard lead time15–30 working days
WarrantyOne year, whole machine

The short version · Three things to know before the datasheet

What it doesFor measurement and inspection of Manual Mounting Presses, producing traceable records instead of visual checks and manual calculation.
Who it fitsIncoming inspection, lab sampling, process validation and final inspection — the larger the batch and the tighter the tolerance, the bigger the gain.
Not the right fit ifIf you only need a one-off rough check, or your parts exceed this model’s range — in both cases we will propose a cheaper route.
Customer— Contact—
Tel— Project—
Qty1 RequirementsConfigured around your samples and test items, meeting repeatability and data-traceability requirements for batch inspection.
In this proposal P2 Requirement & system layout P3 Specifications, explained P4 Scope of supply & workflow P5 Delivery, service & commercial · Standards and signature page
About us

上海中研仪器制造有限公司成立于 2008 年 7 月,注册资本 388 万元,专注金相制样、硬度检测、力学试验与光学测量仪器的研发制造,在售型号 70 余款。国家级高新技术企业(GR202531006980)、上海市专精特新中小企业,两项发明专利已获授权。

整机保修一年,上海奉贤制造基地提供样机测试、夹具定制与上门安装培训。

SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTD · 021-51693591 · zhongyanyiqi@163.comYR-P261118-0045
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTDTECHNICAL PROPOSAL

Metallographic Mounting Press (Manual)

2026-11-18

1. Your requirement

The goal is accurate, fast and traceable measurement. This proposal is built around those three: the machine secures accuracy, the accessories secure fixturing and throughput, the software secures traceability.

Taking the Metallographic Mounting Press (Manual) as an example, key figures on the cover and in section 4; if sample size or batch differs from the description, fixtures and range are adjusted at the technical-protocol stage without changing the base model.

2. How the system is built

Structure & travelStage, travel, dimensions and weight — siting and fixturing
Loading & controlLoading mode, speed, dwell and software interfaces
Power & environmentPower, consumption and ambient requirements
Accessories & configurationStandard, optional and supplied-with items

Modules listed reflect this model’s actual configuration; an omitted group means it does not apply, not that it was left out.

3. Why this model

Before you sign: what the price includes — and what it does not

This section is written before signing so that nothing turns up missing on delivery day. It follows the standard configuration; special requirements can be listed separately in the technical agreement.

Included
  • Main unit plus factory standard accessories (see Section 5)
  • Factory inspection report, certificate, packing list, operation and maintenance manual
  • First installation, commissioning and operation training (remote or on site, travel included)
  • One-year warranty on the whole unit; free upgrades within the same software version for life
  • Domestic transport and transit insurance (up to unloading at your plant)
Not included (quoted separately)
  • Special fixtures, custom tooling and modifications beyond the standard range
  • Third-party metrology verification or calibration (if a CNAS certificate is required)
  • On-site power modification, foundation, compressed air, temperature and humidity control
  • Consumables (indenters, cutting wheels, polishing cloths, reference blocks)
  • Out-of-warranty on-site service and spare parts
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTD · 021-51693591 · zhongyanyiqi@163.comYR-P261118-0045
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTDTECHNICAL PROPOSAL

Metallographic Mounting Press (Manual)

2026-11-18

4. Specifications

机体Benchtop
Control System智能温度、时间控制表
报警提示自动(制样结束自动报警)
Temperature controlAutomatic
Time controlAutomatic
Specimen specification¢25mm/30mm/40mm/45mm(选择)
加热器规格800W
Temperature rangeRoom temperature -300oC
加温时间0-99 分(可调)
Control power supply220V
Overall Dimensions350X400X500mm
Main Unit一台
加料漏斗一只
Manual一份
Warranty card一份
Certificate一份

Three things to check before you compare

If you need a benchmark against your current or an imported instrument, we can run the same samples and issue the data.

SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTD · 021-51693591 · zhongyanyiqi@163.comYR-P261118-0045
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTDTECHNICAL PROPOSAL

Metallographic Mounting Press (Manual)

2026-11-18

5. Scope of supply

Consumables and spares are quoted separately by annual usage; for the first order we recommend one set of wear parts to avoid downtime.

6. Inspection workflow

01Sample prep: prepare specimens to the standard, record IDs and ambient conditions
02Fixturing and setup: select the program, confirm load, range and scale
03Measure and verify: consecutive measurements with out-of-tolerance alerts and re-test when needed
04Reporting: export data with calibration status and measurement uncertainty

7. Applicable standards

SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTD · 021-51693591 · zhongyanyiqi@163.comYR-P261118-0045
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTDTECHNICAL PROPOSAL

Metallographic Mounting Press (Manual)

2026-11-18

8. Delivery and implementation

StageScopeDuration
Technical reviewConfirm samples, range, fixtures and acceptance criteria; sign the technical protocol3–5 days
Production and calibrationAssembly, burn-in, factory calibration with data report15–30 days
Delivery and installationCrated shipment; unpacking, positioning and commissioning on site3–7 days
Training and acceptanceOperation and maintenance training; acceptance test with standard samples1–2 days

9. Acceptance and training

10. Service

11. Commercial terms

PriceQuoted on configuration (tax and domestic freight included)
Payment30% deposit, 70% before shipment
Lead time15–30 working days for standard configuration
Customer (signature & stamp)


Date:
Supplier (signature & stamp)


Date:
This proposal is a technical recommendation. Final scope, acceptance criteria and price are subject to the signed technical agreement.
SHANGHAI ZHONGYAN INSTRUMENT MANUFACTURING CO., LTD · 021-51693591 · zhongyanyiqi@163.comYR-P261118-0045